Sport Reflective Training Long Lead
£29.99
Regular price £22.99Recall and Distance Control
Durable and Strong
Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks
Ideal for mastering the recall technique and for practising distance control commands
Length: 10M x 25mm
£29.99
Regular price £22.99Recall and Distance Control
Durable and Strong
Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks
Ideal for mastering the recall technique and for practising distance control commands
Length: 10M x 25mm
Customer Feedback
"I ordered a pair of jeans, and they fit perfectly! The stitching and fabric quality are top-notch. I’m really impressed with this brand."
"I’ve been looking for a good quality bodysuit for a while, and I finally found the one! Comfortable, chic, and versatile for any outfit!"
"I was so impressed with the delivery speed! My dress arrived quickly and was even better than I expected. I’ll be shopping here again for sure!"